![]() ![]() 2 SB lane of Indian Canyon Drive starting at Tram View Road for demolition of curb NW & SW curb returns. INTERMITTENT LANE CLOSURES WILL AFFECT WB & EB TRAFFIC ALONG RACQUET CLUB AT VIA MIRALESTEĬP 20-19 NEW TRAFFIC SIGNAL AT INDIAN CANYON DR & ROSA PARKS RD CONSTRUCTION WILL RESUME WHEN UNDERGROUND WORK BY SCE IS COMPLETED AND EQUIPMENT HAS BEEN DELIVERED.Ĭontractor will CLOSE the No. 2 lane to install new concrete ramps and traffic signal bases. 2 lanes to install new concrete ramps and traffic signal bases. Traffic control will be removed at the end of each work day.ĮXPECT DELAYS AROUND THE CONTSRUCTION AREA OR USE CALLE ENCILIA OR AVENIDA CABALLEROS ASĬP 21-12 NEW BICYCLE/PEDESTRIAN SIGNAL AT RACQUET CLUB DR & VIA MIRALESTE JULY 18-20, 2023 ~ 7:00AM - 4:00PM Contractor will CLOSE the WB No. Two SBlanes resume past the construction area. 1 SB lanes will be narrowed, but passable. The No.2 SB lane south of Indian Canyon Drive will be closed around the construction area. SCE contrators will be removing and replacing an electrical vault in the Western parking side of the street. EXPECT DELAYS AROUND THE CONTSRUCTION AREA OR USE PALM CANYON DRIVE OR AVENIDA CABALLEROS AS ALTERNATE ROUTESĬalle El Segundo South of Andreas Road Estimated Schedule: Traffic control will be removed at the end of each work day. Two NB lanes resume past the construction area. The SB lane will be narrowed, but passable. 1 and Left-Turn NB lane will be closed at the construction area. Tuesday-Thursday, July 25-28, 2023 ~ 7:00AM-4:00PM SCE contractors will be removing and replacing an electrical vault in the middle of the street. Indian Canyon Drive South of Tahquitz Canyon Way EXPECT DELAYS AROUND THE CONTSRUCTION AREA OR USE ANDREAS ROAD OR ARENAS ROAD AS ALTERNATE ROUTES The WB left-turn lane of Tahquitz Canyon Way at Palm Canyon Drive will be closed. ![]() Tahquitz Canyon Way between Palm Canyon Drive and Indian Canyon Drive Estimated Schedule: EXPECT DELAYS AROUND THE CONTSRUCTION AREA OR USE PALM CANYON DRIVE OR AVENIDA CABALLEROS AS ALTERNATE ROUTES ![]() Two NB & SB lanes resume past the construction area. 1 SB lane of Indian Canyon Drive will be closed around the construction area. SOUTHERN CALIFORNIA EDISON (SCE) Indian Canyon Drive South of Tachevah Drive ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |